RELAY > ON-VEHICLE INSPECTION |
| 1. REMOVE NO. 1 RELAY BLOCK COVER |
| 2. REMOVE INTEGRATION NO.2 RELAY |
Remove the fusible link cover.
![]() |
Disconnect the 2 connectors from the integration relay.
![]() |
Using a screwdriver with its tip wrapped with the protective tape, disengage the 2 claws.
| *1 | Protective tape |
![]() |
Separate the 4 connectors and remove the integration relay.
| 3. INSPECT INTEGRATION NO.1 RELAY (for 1KR-FE) |
![]() |
Check the resistance.
| *1 | Fuse Side |
| *2 | Connector Side |
| *3 | Horn Fuse |
| *4 | Connector A |
| *5 | Connector C |
| *6 | Connector D |
Remove the horn fuse.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1 - 2 | Always | Below 1 Ω |
Install the horn fuse.
If the result is not as specified, replace the horn fuse.
Check the resistance.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A1 - C6 | Always | 10 kΩ or higher |
| A1 - C7 |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A1 - C6 | When battery voltage is applied to terminal A1 and D9 | Below 1 V |
| A1 - C7 |
| 4. INSPECT INTEGRATION NO.1 RELAY (for 1ND-TV) |
![]() |
Check the resistance.
| *1 | Fuse Side |
| *2 | Connector Side |
| *3 | Horn Fuse |
| *4 | Connector A |
| *5 | Connector C |
| *6 | Connector D |
Remove the horn fuse.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1 - 2 | Always | Below 1 Ω |
Install the horn fuse.
If the result is not as specified, replace the horn fuse.
Check the resistance.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A1 - C1 | Always | 10 kΩ or higher |
| A1 - C5 |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A1 - C1 | When battery voltage is applied to terminal A1 and D11 | Below 1 V |
| A1 - C5 |
| 5. INSTALL INTEGRATION NO.2 RELAY |
![]() |
Connect the 4 connectors to the integration relay.
Engage the 2 claws and install the integration relay.
![]() |
Connect the 2 connectors to the integration relay.
Install the fusible link cover.
| 6. INSTALL NO.1 RELAY BLOCK COVER |